It is located along the western side of the Bucharest-Ploiești Road, within the green area between Tipografilor Street and the Miorița railway bridge, in the immediate vicinity of Băneasa railway station. The station is 140 m long and max. 22 m wide.

Structural monitoring

Measurements carried out so far confirm that the integrity of the buildings is within normal parameters.

Traffic restrictions

  • Announcement of July 9, 2025: link
  • Announcement of June 30, 2025: link
  • Announcement of February 21, 2025: link
  • Announcement of February 7, 2025: link
  • Announcement of December 10, 2024: link
  • Announcement of October 4, 2024: link
  • Announcement of September 11, 2024: link
  • Announcement of June 20, 2024: link


Progress of works

  • September 2025: over 49,500 cubic meters excavated and 4,600 cubic meters concreted. Implementation percentage of civil works: 59%.
  • August 2025: over 40,000 cubic meters excavated and over 4,520 cubic meters concreted. Implementation percentage of civil works: 55%.
  • July 2025: 34,837 cubic meters excavated and 4,347 cubic meters of concrete poured. Implementation percentage of civil works: 53.3%.
  • June 2025: 30,241 excavated cubic meters and 3,668 concreted cubic meters. Implementation percentage of Civil Works: 51,9%.
  • May 2025: 24,964 excavated cubic meters, 3,012 concreted cubic meters;
  • April 2025: 16,647 excavated cubic meters, 2,609 cubic meters concreted, 320 m guide beam, 54 diaphragm wall panels, 18 barrettes, 12 plastic D-Walls, 90 plastic piles, 90 piles for Access A;
  • March 2025: 320m guide beam, 54 diaphragm wall panels, 18 barrettes, 12 plastic D-Walls, 90 plastic piles, 72 piles for Access A, over 11,500 excavated cubic meters, over 610 cubic meters concreted;
  • February 2025: 90 plastic piles;
  • Ianuary 2025: 54 diaphragm wall panels, 18 barrettes,12 plastic piles;
  • December 2024: 320m guide beam, 51 diaphragm wall panels, 17 barrettes and 9 plastic piles;
  • November 2024: 47 diaphragm wall panels;
  • October 2024: 39 diaphragm wall panels and 14 barrettes;
  • September 2024: 36 diaphragm wall panels and 6 plastic piles;
  • August 2024: 289m de guide beam, 22 diaphragm wall panels and 5 plastic piles;
  • July 2024: 241m of guide beam out of a total of 325m have been completed. In addition, 9 panels of diaphragm wall panels (out of total 54) and 2 diaphragm wall panels for ground reinforcement for TBM exit from the tunnel have been executed;
  • June 2024: formwork, concreting and reinforcement for the guide beam were executed;
  • May 2024: Excavation, backfilling and formwork was executed and 51 cubic meters of concrete was poured for the guide beam. 900 cubic meters of soil was excavated;
  • March 2024: survey excavations and injection testing;
  • February 2024: fencing; the area was cleared of spontaneous vegetation, the existing fence was demolished, measurements and borings for utility network surveys were taken. A manual survey of the station’s foundations was carried out, as well as pest control, disinfection and eradication operations.
The future M6 metro line will transform the daily commute into a pleasant and fast journey to important destinations within the capital and Ilfov. Stations under construction:
South Section
Pajura

Located on the northern side of the Bucharest – Constanța railway, near Băiculești Street.

Read more
EXPOZIŢIEI

Located north of the eastern entrance of Romexpo.

Read more
PIAŢA MONTREAL

It will be located on Mărăști Boulevard, adjacent to the tram and bus terminal near Piața Montreal.

Read more
GARA
BĂNEASA

Adjacent to the Bucharest – Ploiești Road, on the esplanade in front of Băneasa Station, at the intersection of Tipografilor Street, the Bucharest – Ploiești Road, and the Bucharest – Constanța railway.

Read more
AEROPORT
BĂNEASA

Adjacent to the Bucharest – Ploiești Road, north of the intersection between Aerogării Boulevard and the Bucharest – Ploiești Road

Read more
TOKYO

Adjacent to the Bucharest – Ploiești Road, near the overpass next to the Băneasa Shopping City complex.

Read more
North Section
WASHINGTON

Located adjacent to the Bucharest – Ploiești Road, near the overpass at Jandarmeriei Street.

Read more
PARIS

Located at the intersection of the Bucharest – Ploiești Road and Padina Street.

Read more










BRUXELLES

Located near the overpass at the intersection of the Bucharest – Ploiești Road and the Capital’s ring road.

Read more
OTOPENI

At the intersection of Calea Bucureștilor and 23 August Street in Otopeni.

Read more
ION I.C. BRĂTIANU

At the intersection of Calea Bucureștilor and Zborului Street in Otopeni.

Read more










AEROPORT OTOPENI

Under the roadway in front of Otopeni “Henri Coandă” International Airport, near the parking area adjacent to the Departures terminal and the exit routes from the Arrivals terminal.

Read more