Skip to main content

M6: Ongoing works and temporary traffic changes

M6 Metro Line will enable the first direct, fast connection between Gara de Nord and Henri Coandă International Airport. The new line will have 14.2 km long with double-track rail and 12 stations, serving key areas of the capital and the city of Otopeni: 1 Mai, Romexpo, Gara Băneasa, Aeroport Băneasa, residential, commercial, and business areas along DN1, and Henri Coandă International Airport.

During this period, complex construction works, including the execution of underground structures and the relocation of utility networks are currently being carried out along the entire route of M6 Metro Line. To ensure these activities are carried out safely, temporary traffic restrictions have been implemented in certain areas along the project’s two sections—South and North.

Below are the main works currently carried out and the areas where they affect traffic.

As certain projects are completed, traffic management is adjusted to minimize the impact on urban mobility.

SOUTH SECTION

🟢1 MAI Station 🏗️ Utility relocation, diaphragm walls | 📍 Restrictions/diversions: Calea Griviței – Ion Mihalache Blvd.

🟢PAJURA Station 🏗️ Station structure, accesses | 📍 No impact on traffic

🟢EXPOZIȚIEI Station 🏗️ Station structure, accesses | 📍 Restrictions/diversions: Expoziției Blvd.

🟢EXPOZIȚIEI – PIAȚA MONTREAL interstation 🏗️ Utility relocation | 📍 Restrictions/diversions: Expoziției Blvd. – Aviator Popișteanu Street

🟢PIAȚA MONTREAL Station 🏗️ Station structure, accesses | 📍 Restrictions/diversions: Mărăști Blvd.

🟢PIAȚA MONTREAL – GARA BĂNEASA interstation 🏗️ TBM tunnelling, utility relocation | 📍 No major impact on traffic

🟢GARA BĂNEASA Station 🏗️ Utility relocation, accesses | 📍 Restrictions/diversions: Șos. București-Ploiești (Fântâna Miorița)

🟢GARA BĂNEASA – AEROPORT BĂNEASA interstation 🏗️ Utility relocation | 📍 Restrictions/diversions: DN1 – Elena Văcărescu Street and Dobrogeanu Gherea Street

🟢AEROPORT BĂNEASA Station 🏗️ Utility relocation, accesses | 📍 Restrictions/diversions: Grațioasa Street, DN1 – Aerogării Blvd.

🟢AEROPORT BĂNEASA – TOKYO interstation 🏗️ Utility relocation | 📍 Restrictions/diversions: Selgros slip road

🟢TOKYO Station 🏗️ Station structure, accesses | 📍 Restrictions/diversions: DN1 slip road (towards Bucharest), Pană Buescu Street

NORTH SECTION

🟢WASHINGTON Station 🏗️ Utility relocation | 📍 Restrictions/diversions: Jandarmeriei Street – Dr. Liviu Librescu Blvd., DN1 slip road

🟢PARIS Station 🏗️ Utility relocation, diaphragm walls, accesses | 📍 Restrictions/diversions: DN1 – Padina Street

🟢BRUXELLES Station 🏗️ Utility relocation, diaphragm walls | 📍 Restrictions/diversions: Oașului Street

🟢OTOPENI Station 🏗️ Diaphragm walls, station structure | 📍 Restrictions/diversions: DN1 – Calea Bucureștilor, 23 August Street

🟢ION I. C. BRĂTIANU Station 🏗️ Utility relocation, accesses | 📍 Restrictions/diversions: DN1 – Calea Bucureștilor and Zborului Street

🟢AEROPORT OTOPENI Station 🏗️ Utility relocation, diaphragm walls, station structure | 📍 Restrictions/diversions: Departures area, internal roads and car parks

Thank you for your understanding and for observing the road signs in the construction areas.

Access changes on DN1 from Aerogării Boulevard for construction work at the future Aeroport Băneasa metro station

Starting May 30, 2026, road traffic in the area of DN1 and Aerogării Boulevard intersection will be temporarily rerouted to enable the continuation of construction work on the future Aeroport Băneasa metro station – part of M6 Metro Line – and the construction of the underground pedestrian passage (access and tunnel).

The traffic measures will be in effect for an estimated period of about seven months, allowing the works to be carried out safely and with as minimal impact on traffic as possible.

Traffic changes
At this stage of the works, the access slip road from Aerogării Boulevard to the DN1 will be temporarily closed.
To maintain the flow of traffic towards Otopeni Airport, traffic on Aerogării Boulevard will be diverted on a new temporary two-lane slip road, set up within the M6 Metro Line construction site, near Grațioasă Street.
At the same time, on Aerogării Boulevard, in the direction towards Ion Ionescu de la Brad Boulevard, traffic will be ensured on two lanes.

Measures to ensure the safety of traffic participants
To ensure traffic flows safely, additional safety and traffic management measures have been put in place in the area where the works are taking place:

  • provision of temporary pedestrian crossings;
  • installation of protective panels around the construction site;
  • application of temporary road markings;
  • provision of new pedestrian crossings.

The works and the traffic measures are carried out with the approval of the competent institutions, namely C.N.A.I.R., I.G.P.R., C.T.C. – P.M.B. and the Bucharest Traffic Police Brigade.

For updated information on the status of the works and on traffic management, follow the Facebook page and the official website: www.magistrala6.ro.

From unpredictable traffic to predictable time: what M6 Metro Line will bring

How many times have you left to the airport without knowing how long it would take? The distance from Gara de Nord to Henri Coandă International Airport is about 17 kilometres. Depending on the time of day and the day of the week, the same journey takes 20 – 25 minutes on a Sunday morning and 60 – 90 minutes on a Thursday at 5.00 pm. This unpredictability is not a minor inconvenience – it is an invisible cost on your time.

The metro works differently. There are no jams and no unpredictability: the train leaves at regular intervals and covers the route in the same time – the same at 7:00 a.m as at 6:30 p.m. Predictability is, in itself, a resource.

The time savings during peak hours are obvious: M6 Metro Line 6 will cover the route from end to end in 22 – 25 minutes. Compared to 60 – 90 minutes by car – according to the TomTom Traffic Index 2025, Bucharest – a saving of 50 minutes per journey means: 50 minutes × 2 journeys a day × 250 working days a year = 25,000 minutes = 416 hours = 17 days and 8 hours regained every year. This isn’t a statistical average – it’s real time, your time, which you currently spend stuck in traffic.

For the 16 million passengers who pass through Henri Coandă Airport every year – according to Bucharest Airports statistics – predictable access to the airport also means something else: being able to plan precisely, without the margin of error imposed by traffic. Metro Line 6 helps you save time.

Sources: TomTom Traffic Index 2025 – Bucharest | Bucharest Airports – Traffic statistics | GD 930/2016 – Technical and economic indicators, Metro Line 6

How M6 Metro Line can ease the pressure on Bucharest traffic

According to the TomTom Traffic Index 2025 (data for 2024), Bucharest ranks 3rd in Europe and 22nd in the world for traffic congestion. The average travel speed in the city is 13.3 km/h, and a driver loses an average of 171 hours a year because of traffic – the equivalent of 7 days and 3 hours.

According to the technical and economic indicators approved by Government Decision H.G. 930/2016, M6 Metro Line will have a transport capacity of 50,000 passengers per hour, in each direction. A study published in Nature Cities (2025) confirms that metro systems significantly reduce car use in European cities. Based on the experience of similar projects, between 15 and 25 out of every 100 passengers on a new metro line are former drivers who choose to leave the car at home — which, for M6 Metro Line, could mean thousands of fewer vehicles every day on the capital’s northern corridor.

On saturated arteries, a reduction of 15–20% in traffic volume increases the average travel speed by 20–35% for everyone — including those who continue to use the car. (Transportation Research Board – Highway Capacity Manual, 7th Edition, 2022). Thus, on congested roads, a 15-20% reduction in traffic volume increases the average journey speed by 20-35% for all traffic participants – including those who continue to use their cars. (Transportation Research Board – Highway Capacity Manual, 7th Edition, 2022).

European precedents confirm this trend: following the opening of the M2 metro line in Warsaw (2015), passenger numbers on parallel routes decreased significantly, according to Warsaw Metro. Cities with extensive metro networks, such as Vienna and Stockholm, consistently record some of the lowest congestion levels in Europe.

Less stress in traffic is not a slogan. It is a mathematical consequence of M6 Metro Line.

Sources: TomTom Traffic Index 2025 – Bucharest | GD 930/2016 – Technical and economic indicators, Metro Line 6 | Nature Cities (2025) – Prieto-Curiel et al., modal shift metro | Transportation Research Board – HCM 7th Ed. (2022) | Warsaw Metro – M2 Line

M6 Metro Line and the reduction of urban noise: the impact of a fully underground route

Urban noise is not merely an everyday nuisance. At European level it is treated as an environmental and public health issue. Directive 2002/49/EC on the assessment and management of environmental noise establishes a common framework for identifying, preventing and reducing the harmful effects of exposure to noise, particularly in large urban areas and in areas affected by road, rail or air traffic.

In this context, investment in electric public transport is becoming essential. M6 Metro Line, which will provide a direct link between Gara de Nord and Henri Coandă – Otopeni International Airport, is one such project: an underground infrastructure with a direct impact on mobility and the potential to reduce surface traffic congestion along the capital’s northern corridor.

European data show that the issue of noise is not an abstract one. According to the European Environment Agency report Environmental noise in Europe 2025, long-term exposure to traffic noise is associated with significant effects on health and quality of life. The report estimates that, across Europe, this contributes annually to numerous health problems, including cardiovascular diseases and sleep disorders, as well as to significant economic costs. Furthermore, millions of Europeans are affected by severe sleep disturbances caused by traffic noise, and the economic impact of transport-related noise pollution is estimated at over 100 billion euros annually. The World Health Organisation has also drawn attention to this issue. The WHO Environmental Noise Guidelines for the European Region, published in 2018, recommend a limit of 53 dB Lden for road traffic, which is stricter than the European threshold of 55 dB. The reason is simple: constant exposure to noise can affect sleep, cardiovascular health and, ultimately, quality of life.

For Bucharest and the Otopeni area, the implications are concrete. According to the technical and economic indicators approved by Government Decision 930/2016, M6 Metro Line will have a maximum transport capacity of 50,000 passengers per hour, in each direction. This capacity can absorb a significant flow of passengers who currently use road transport, thereby helping to reduce the number of cars on the DN1 and on the adjacent roads.

The more cars there are in traffic, the higher the noise level. Conversely, every journey shifted from the car to electric public transport means less pressure on the city. M6 Metro Line serves two purposes: it provides an underground service, with no surface noise, along the route from Gara de Nord to Otopeni Airport, and it helps to reduce road traffic on one of the busiest transport corridors in the Bucharest area.

The benefits will be felt both by residents of the areas along the alignment and by those who continue to use the DN1. Smoother traffic implicitly means less noise from engines, braking, acceleration and horns.

Quiet is rarely the first argument when we talk about infrastructure. More often, we discuss speed, capacity, connectivity or safety. But in the case of M6 Metro Line, acoustic comfort becomes part of the wider change the project brings to the city: mobility that is more efficient, cleaner and friendlier to people.

Sources: EEA – Environmental noise in Europe 2025 | WHO – Environmental Noise Guidelines for the European Region 2018 | Directive 2002/49/EC | GD 930/2016 – Technical and economic indicators, M6 Metro Line

M6 Metro Line: lower emissions on the route between Bucharest and Otopeni Airport

Transport is one of the sectors in which Romania needs to reduce the pressure on the climate and air quality. According to Romania’s Long-Term Strategy for Reducing Greenhouse Gas Emissions (Government Decision 1215/2023), between 1990 and 2019, emissions from the transport sector rose by 41%, reaching 18,937 kt CO₂ equivalent in 2019, with road transport as the dominant source – representing approximately 96% of the sector’s total.

source: https://sgg.gov.ro/1/wp-content/uploads/2023/11/ANEXA-1-21.pdf

Along the DN1 – Otopeni – Bucharest corridor, this reality is evident every day: the link between the capital, the northern region and Henri Coandă International Airport relies heavily on private cars, taxis and other road vehicles. M6 Metro Line changes this equation, offering a fast, predictable public transport alternative with significantly lower operational emissions per passenger.

Car versus metro
We can make a comparison: let’s take as a reference the road distance of approximately 16-17 km between the Gara de Nord area and Henri Coandă / Otopeni International Airport. Our World in Data indicates, based on UK government reporting figures, approximately 170 g CO₂e/km¹ for a petrol-powered car and approximately 35 g CO₂e/passenger-km for domestic rail transport.
For urban light rail and metro systems, the 2024 UK government methodology (DESNZ – GHG Conversion Factors) indicates an average of 26.16 g CO₂e/passenger-km, whilst for the Glasgow Underground the figure is 34.70 g CO₂e/passenger-km. These values are international benchmarks for comparison, not official factors specific to M6 Metro Line or Romania.
Applying these benchmarks to a distance of 16-17 km, a car journey with a single occupant generates approximately 2.7-2.9 kg CO₂e one way, or 5.4-5.8 kg CO₂e for a return trip. For urban electric transport (26-35 g CO₂e per passenger-km), the same journey would generate approximately 0.42-0.60 kg CO₂e one way, or 0.83-1.19 kg CO₂e return.
The difference is significant: for every passenger who chooses the metro instead of a private car, the estimated saving is around 2.1-2.5 kg CO₂e one way, or 4.2-5.0 kg CO₂e for a return journey. Assuming a car with a single occupant, the metro can have a carbon footprint some 5 to 6.5 times smaller per passenger-km, depending on the emission factor used and on how heavily the system is loaded.

The other emissions matter too
CO₂ is not the only relevant pollutant. Road traffic generates nitrogen oxides, carbon monoxide and particulate matter, PM10 and PM2.5. According to the European Environment Agency (EEA) – Emissions of air pollutants from transport, the pollutants emitted by transport contribute to the deterioration of air quality and put pressure on human health. Although exhaust emissions have dicreased in recent decades, particles from the wear of brakes, tyres and road surfaces remain an important component of the pollution generated by road transport.
The electric metro produces no exhaust emissions along its route. Therefore, for journeys transferred from car or taxi to the metro, M6 Metro Line will help reduce local emissions in the areas it crosses and ease the pressure created by road traffic on the Otopeni – Bucharest corridor. The benefit is not only climatic but also urban: more public transport means more predictable mobility, a more efficient link with the airport and a real alternative for the residents, employees and visitors of the northern area of the capital.

M6 Metro Line is a public utility project of national interest, which provides the link between the metro network and Henri Coandă International Airport and contributes to the development of the trans-European transport network TEN-T. The project is not only an investment in infrastructure, but also an urban mobility measure with direct effects on emissions, air quality and connectivity between Bucharest and the airport.

¹CO₂e/km = carbon dioxide equivalent per kilometre. CO₂e (CO₂ equivalent) is a unit of measurement that includes not only carbon dioxide (CO₂) but also the other greenhouse gases, expressed as CO₂ equivalent. Cars also emit methane (CH₄) and nitrous oxide (N₂O), not just CO₂. CO₂e adds them all into a single figure, converting them according to their global warming potential. In practice, for a car the difference from pure CO₂ is small, so when the article says “170 g CO₂e/km”, it can be read as “roughly 170 g of greenhouse gases per km, expressed as CO₂”. Per km means per kilometre travelled, with a single passenger in the car (or per passenger-km for public transport, where the emissions are divided by the number of people in the vehicle).

Sources:
Romania’s Long-Term Strategy (GD 1215/2023) | Our World in Data – Travel Carbon Footprint | UK Gov GHG Conversion Factors 2024 | CNAB – Statistical data 2024 | EEA – GHG emissions from transport | EEA – Pollutants from transport

Progress on M6: TBM “Sfânta Maria” breaks through at Piața Montreal station

The Tunnel Boring Machine (TBM) “Sfânta Maria” broke through the wall of the future Piața Montreal metro station, today, on the alignment of the future M6 Metro Line.

Representatives of the Ministry of Transport and Infrastructure and of Metrorex attended the event.

The boring shield “Sfânta Maria” is excavating the Line 2 tunnel on the SOUTH Section of M6 Metro Line, and today it completed the third tunnel segment on this line.

The tunnel completed so far by the machine – 97 metres long, weighing 600 tonnes, with a cutterhead 6.60 metres in diameter – between the future Tokyo, Aeroport Băneasa, Gara Băneasa and Piața Montreal metro stations, totals almost 3 km (2,836 linear metres) excavated and 1,895 tunnel rings assembled.

The length of the underground tunnel that TBM “Sfânta Maria” will complete to 1 Mai station is 6.6 km.

“Metrorex continues to build for people, for the city, for Romania and for a sustainable future. The breaking through of the wall of Piața Montreal station by TBM “Sfânta Maria” is another important milestone in the construction of M6 Metro Line. The pace at which the works are advancing is the result of the good coordination between everyone involved in the project, from the contractors to the funders. M6 Metro Line will provide a fast and modern connection between the metro network and Henri Coandă International Airport, contributing significantly to the development of urban mobility in Bucharest,” said the Director General of Metrorex, who attended the event.

The Building Permit has been issued for the architectural works, track works, electromechanical and low-voltage installations for M6 Metro Line

Metrorex announces that the Building Permit has been issued for the “Bucharest International Airport Rail Access Link Project (Metro Line 6. 1 Mai – Otopeni)”, covering the architectural works, the trackwork and the electromechanical and low-current installations.

The document marks the next major step in implementing the M6 Metro Line project, one of the most important public transport infrastructure projects in Romania and an integral part of the trans-European transport network TEN-T.

The value of the authorised works, excluding VAT, amounts to 1,037,578,107.47 lei, and the construction period is 31 months, calculated from the date the works actually begin. The works will be carried out by the joint venture SOMET S.A. – SALCEF GROUP – THEDA MAR S.A. – TIAB S.A. – UTI CONSTRUCTION AND FACILITY MANAGEMENT S.A. – ALTIMATE S.A., with SOMET S.A. as joint venture’s leader.

At present, the civil works are on going along the entire length of the future M6 Metro Line alignment. On the SOUTH SECTION, covering the distance between 1 Mai – Tokyo future metro stations, the civil works have reached 66%, while on the NORTH SECTION, the section between Tokyo – Aeroport Otopeni future metro stations, the civil works stand at 32%.

The progress made by the two operational TBMs is as follows:

– TBM “Sfânta Maria” (Line 2): has completed more than 2,819 linear metres of tunnel and installed 1,875 rings;

– TBM “Sfânta Ana” (Line 1): has completed more than 2,122 linear metres of tunnel and installed 1,410 rings.

“Bucharest International Airport Rail Access Link Project (Metro Line 6. 1 Mai – Otopeni)” is a public utility project of national interest, in accordance with Government Decision no. 496/2017, contributing to the development of the trans-European transport network. M6 Metro Line is a project for Romania! Follow the official website www.magistrala6.ro for updated information.

Yours sincerely,

DIRECTOR GENERAL,

Mariana MICLĂUȘ

Traffic changes at the access to the Băneasa Shopping Complex, due to works on M6 Metro Line

From 24 April, traffic changes will be introduced in the access area leading from the DN1 to the Băneasa Shopping Centre, due to works on the future Tokyo metro station, which is part of the M6 Metro Line, 1 Mai – Otopeni project.

These interventions are needed in order to build the infrastructure of the new station, including its accesses and pedestrian connections.

Planned works: an underground pedestrian passageway will be built beneath Pană Buescu Street. It will serve Access B of Tokyo metro station, located in the IKEA car park area, allowing passengers to reach the station safely.

Traffic changes: for an estimated period of about seven months, the route of Pană Buescu Street will be altered before the roundabout under the road overpass, in order to divert traffic and allow the works to be carried out.

  • The overpass slip road will remain unchanged, with the existing vehicle accesses maintained;
  • Pedestrian traffic will be ensured safely, on prepared pavements and via signposted pedestrian crossings;
  • Viorel Ciurea Street will be connected to the DN1, providing an additional exit route from the Băneasa Shopping Complex.

The works are being carried out on the basis of the approvals issued by the competent institutions, namely the National Company for Road Infrastructure Administration (CNAIR), the General Inspectorate of the Romanian Police (IGPR), the Technical Traffic Commission of Bucharest City Hall and the Bucharest Traffic Police Brigade.

We thank traffic participants for their understanding.

Temporary traffic restrictions at the Piața Presei Libere underpass

Access to the Piața Presei Libere underpass will be restricted on the nights of 21/22 April and 22/23 April 2026, between 11:00 pm and 05:00 am.

The restrictions are needed in order to install topographic equipment in the area of the future Piața Montreal metro station, on the South Section of the future M6 Metro Line. As part of these activities, survey reference points will be installed and used for the structural monitoring of the underpass and of the buildings within the zone of influence. The works are being carried out with the approval of the competent authorities.

Outside the periods indicated, traffic through the underpass will run normally.

Traffic on the carriageway outside the underpass will not be restricted and will not be diverted.

In order to reduce the impact on road traffic and the inconvenience to traffic participants, the works are being carried out at night only.

The works will be signposted in accordance with legal requirements, and once the activities are completed the road will be reopened and the road signs will be restored to their original state.

We thank traffic participants for their understanding.