Skip to main content

Updated information on traffic restrictions at Fântâna Miorița, Gara Băneasa, on the Șoseaua București – Ploiești

For execution activities under the contract “Bucharest International Airport Rail Access Link Project (Metro Line 6. 1 Mai-Otopeni). Design and Build – Civil Works for Lot 1.1: 1Mai-Tokyo”, METROREX announces changes to traffic restrictions in the Fântâna Miorița, Gara Băneasa, Șoseaua București – Ploiești area, on the alignment of the future M6 Metro Line, SOUTH Section.

The restrictions will be enforced on Saturday, August 9, 2025, by night, starting with 11 p.m., in the presence of the Traffic Police.

According to the renewed Traffic Opinion, based on the Traffic Plan approved as part of the works for M6 Metro Line, SOUTH Section, until 01.09.2025, there will be changes in traffic flow in the above-mentioned area due to construction activities required by the fourth stage of works for the future “Gara Băneasa” metro station.

The work will be carried out by occupying traffic lanes I and II in the direction of Piața Presei Libere.

The traffic on the Șoseaua București-Ploiești, in the Fântâna Miorița area, will be restricted to two lanes in each direction, which will be appropriately marked and signalized.

Traffic to and from Tipografilor Street will be restricted to one lane.

Metrorex would like to thank all traffic participants on the above-mentioned route for their understanding, as well as residents and companies operating in the vicinity of the worksites.

M6 Metro Line will provide a direct connection from Gara de Nord to Henri Coandă International Airport. Covering a distance of 14.2 km, it will include 12 metro stations: Pajura, Expoziției, Piața Montreal, Gara Băneasa, Aeroport Băneasa, Tokyo, Washington, Paris, Bruxelles, Otopeni, Ion I. C. Brătianu, Aeroport Otopeni.

“Bucharest International Airport Rail Access Link Project (Metro Line 6. 1 Mai – Otopeni)” is a public utility project of national interest, according to Government Decision No. 496/2017, with subsequent amendments and additions, which ensures the mobility needs of people through the development of the trans-European transport network.

No Comments yet!

Your Email address will not be published.