Skip to main content

South Section

The “Bucharest International Airport Rail Access Link Project (Metro Line 6. 1 Mai – Otopeni)” is a project of public utility and national interest, in accordance with Government Decision no. 496/2017, with subsequent amendments and additions. The project addresses the mobility needs of individuals by developing the trans-European transport network (TEN-T). 

Traffic changes at the access to the Băneasa Shopping Complex, in the context of the Metro Line 6 works

From 24 April, changes to traffic will be introduced in the access area from the...

Temporary traffic restrictions at the Piața Presei Libere underpass

Access to the Piața Presei Libere underpass will be restricted on the nights of 21/22...

U.T.C.B. students visit the Metro Line 6 site: a practical lesson about the future metro to Otopeni

Third-year students from the Technical University of Civil Engineering Bucharest – Faculty of Railways, Roads...

Study visit on M6: future leaders in direct contact with major infrastructure projects

The Ministry of Transport and Infrastructure, together with Metrorex, hosted a study visit dedicated to...

U.T.C.B. students visit the Metro Line 6 construction site

Engineering is one of the fields in which theory and practice complement each other in...

Spring has arrived on the metro: flowers, mărțișoare and good news

Spring has made itself felt on the Bucharest metro network too. Metrorex representatives welcomed women...

Progress on M6: TBM “Sfânta Ana” breaks through at Gara Băneasa station

March began on the SOUTH Section with the completion of the second tunnel segment, roughly...

Prompt intervention on Strada Tipografilor, in the area of the Metro Line 6 site

Following the articles that appeared in the press about the incident that occurred yesterday, 26...

International monitoring of progress on Metro Line 6

Between 24 and 26 February 2026, the Japan International Cooperation Agency (JICA) carried out a...