
On the second day of the Railway Days SUMMIT, October 29-30, 2024, 19th edition, the General Director of Metrorex, Mariana Miclăuș, presented the current status of the metro projects underway and those in preparation.
METROREX traditionally participates in this landmark event for Eastern Europe, which annually brings together local and international representatives.
As a speaker invited to hold a presentation at the panel “Modernization of the rail, urban and peri-urban infrastructure”, Mrs. Miclăuș underlined Metrorex’s commitment to the expansion and modernization of the Bucharest metro network.
The development of future main lines: Line 4, Line 5, Line 6, Line 7 and Line 8, have been among the projects discussed, as well as extensions of the existing ones, which will be realized in cooperation with local authorities.
In addition to the presentations of specialists in the field, Metrorex, alongside the other members of the industry, also exhibited a stand where those interested could find out the latest news about the company.