“Bucharest International Airport Rail Access Link Project (Metro Line 6. 1 Mai – Otopeni)” is a public utility project of national interest, implemented by Metrorex S.A. with the support of the Ministry of Transport and Infrastructure, and it is financed from several sources – the state budget, non-reimbursable external funds and reimbursable external funds.

Three major works contracts have been signed with the Beneficiary to date:

LOT 1.1


“Bucharest International Airport Rail Access Link Project (Metro Line 6. 1 Mai-Otopeni). Design and Build – Civil Works for Lot 1.1: 1Mai-Tokyo”

The funding for the design and build of the South Section is provided from the state budget of Romania and from non-reimbursable European funds.

LOT 1.2

“Bucharest International Airport Rail Access Link Project (Metro Line 6. 1 Mai-Otopeni). Design and Build – Civil Works for Lot 1.2: Tokyo-Aeroport Otopeni”

The funding for the design and build of the North Section is provided from the state budget and from reimbursable external funds, through the external loan granted by the Japan International Cooperation Agency (JICA).

PACKAGE 2

“Bucharest International Airport Rail Access Link Project (Metro Line 6. 1 Mai-Otopeni). Design and Build of architectural works, trackwork, electromechanical and low-current installations”

The funding for the design and build of Package 2 is provided from the state budget.